We laid the new concrete floor in the outbuilding yesterday. The concrete (around 2.5 tonnes) was due to arrive at 3pm, but eventually got here at 5:30pm (shortly after we had packed up our tools and decided to go down the pub!). Once it arrived, we had little choice but to lay the floor. In the end, it only took about an hour, but it was at the end of the day and it felt like a very long hour.
Earlier in the day, I had laid some rubble at the far end of the floor in an attempt to level it up a bit. We want the finished floor level to be higher than the drive outside (so water doesn’t run in) and sloping slightly to the front (so if water does get it, it will flow out). I use the rubble to level up the worst of the floor and then put some crushed stone on top (about 1 tonne). This was then compacted with a Wacker plate rented from a local hire shop. Then we put down some Visqueen damproof membrane and then a couple of tonnes of concrete on top. The concrete came from Hi Spec concrete in Huddersfield. The machine mixes the concrete on site and we were fortunate to be able to shoot it straight into the outbuilding. There was still a lot of shovelling to do to get it into all the right places, but shooting the concrete right in makes life a lot easier.
The finish is pretty good and at the end of the day, it is a shed! However, pride kicks in and you want to make it look the best you can.