We need three phase supply for our ground source heat pump. The supply was installed today and the existing overhead cables and the supplies to the two previous properties were recovered.
We dug the trench from the front to the rear of the property. Do make sure that you read the details carefully about how the trench – and the conduit – need to be laid. It took the best part of a day to pull the cable through, connect it to the supply on the pole and make the joint into the cable for the house.