Almost of the tiles are down in the kitchen – there are just some upstands (tile skirtings) to install at one end of the kitchen.
Tomorrow, the tiles will be grouted before the kitchen appliances are installed on Friday. We are still waiting for an update on the sinks. Until these arrive, the granite worktops cannot be finished or installed. Last we heard, two out of three of them were on their way from Spain!
All of the cuts around the island unit have now been completed. The upstands (tile skirtings) have also been done. Grouting tomorrow.
The tile upstands (tile skirtings) are now in place as well as the tile step into the lounge – there will be timber flooring in the lounge. We have also tiled the window cill to the right of the step. Longer term, there will be some artwork here. The timber flooring in the lounge should be installed later this week (or maybe early next week).