We have 14 workmen onsite today – 2 plumbers, 3 builders, 2 heating engineers, 2 plasterers, 3 electricians, 1 joiner and 1 roofer.  And me.

Trying to make sure that everyone has enough space to work is the main problem, but everyone seems to be getting along (just).  The car (or van) parking situation is causing a little bit of a problem, but with the wet weather recently, it is jsut to muddy to get vehicles into the back field.

However, it does mean that we are making a lot of progress.

Only the ridge tiles to go on the kitchen roof and some lead flashings, then the roof is all done.  Even as it is, it is water-tight.

Only the ridge tiles to go on the kitchen roof and some lead flashings, then the roof is all done. Even as it is, it is water-tight.