The weather was ok today with no rain, so we spent the whole day on the wall in the courtyard garden.  We have now got the end wall above the level of the blockwork for the reatining wall.  The wall will need to come up a little further, but it will do for now.  We are now starting to work on the wall that will adjoin the timber steps that lead to the upper terrace.

We spent most of the day today building the wall in the courtyard.  We are making the most of the fine weather, after all, it isn't going to be last much longer. We are now about to turn the corner where the timber steps will be built.

We spent most of the day today building the wall in the courtyard. We are making the most of the fine weather, after all, it isn’t going to be last much longer. We are now about to turn the corner where the timber steps will be built.

The end wall is now up to the same level (and in some place, above) the retaining blockwork. We have used 3 one tonne bags of 3.5 inch stones and one bag of "jumpers" (the bigger 6 inch stones).

The end wall is now up to the same level (and in some place, above) the retaining blockwork. We have used 3 one tonne bags of 3.5 inch stones and one bag of “jumpers” (the bigger 6 inch stones).

We are sorting out the reclaimed stone as we build the wall.  The stones are sorted into groups according to their height.  All of these stones are 8cms high.

We are sorting out the reclaimed stone as we build the wall. The stones are sorted into groups according to their height. All of these stones are 8cms high.