The barn is now a thing of the past. With the aid of a 4.5 tonne digger. It made quick work of demolishing the stone work that was left and loading the rubble into a dumper. The spoil heap is now getting pretty impressive.
The stone on the front of the barn will be re-used, however, much of the stone is only good for building dry stone walls. Fortunately, we have a lot of these to do.