Almost there. The timber from the roof was cut up using a chainsaw and went on the bonfire (together with odd ends of timber left in the store room).
The brick partitions were demolished using a sledgehammer – we will use the bricks in the foundations of the dry stone wall in the orchard. We moved them using the pickup.