Before the new concrete floor slab can be laid, the plastic drains need to be inserted into the foundations. There appears to be a lot of them!

We were hoping that the new concrete slab for the extension would go down this weekend.  However, the excavations for the ground loops has distracted us (big time!).

OLYMPUS DIGITAL CAMERA

The view from the spoil heap of the new drains going in.

The view from the spoil heap of the new drains going in.