The firebox for the lounge arrived yesterday.  We have a slight problem in that the baffle (butterfly) for the flue seems to be missing.  However, we should be able to get the unit into position and build the stone fireplace around it. There will be some “fine tuning” required, but nothing that the builder can’t deal with. The design of the fireplace is covered here.  However, re-looking at the pictures, we have significantly changed the design – we are now using a firebox with 3 sides of glass rather than 2.  We have also gone for a design that is a little more symmetrical.

We are going to have to wait for the missing flue part before using it, however, we can get on with the job of installing it into the fireplace.

The installers are also going to install the Firebelly stove that we bought a few months ago.  So although the Spartherm unit might not be operational this weekend, the Firebelly should be!

It doesn't look very impressive, does it? But over the next few days the fire place will be built around this Spartherm fire box.  This is an Arte 3RL 100h (if anyone is interested!).  It weighs in at a massive 300kgs!

It doesn’t look very impressive, does it? But over the next few days the fire place will be built around this Spartherm fire box. This is an Arte 3RL 100h (if anyone is interested!). It weighs in at a massive 300kgs!

And here is what the firebox looks like once it is in position!