Well, there was a lot of work to be done in a short time, but the contractor was confident of getting it all done last week.  Unfortunately, it looks like we should be ready by tomorrow lunchtime – 2.5 days late.  As it happens, it shouldn’t cause too much of a problem.  While the plasterers are due to start tomorrow, I suspect that they will spend most of the day getting the plasterboard to where it needs to be – we have just brought it inside the house (out of any potential weather), but will leave it to the plasterers to carry it up the stairs!

This is the cabling for the lighting, network, power and telephone.  It all comes back to a central point in a cupboard on the top of the cellar steps.

This is the cabling for the lighting, network, power and telephone. It all comes back to a central point in a cupboard on the top of the cellar steps.

This is a photo on the first floor.  You can see the underfloor heating above the cables.  Yellow cables are for light switches (Cat5e), black are co-ax for the TV/radio, purple are Cat6 network cables, white cables are for the alarm system and the grey round cables are for data/telephone. There are a lot of them!

This is a photo on the first floor. You can see the underfloor heating above the cables. Yellow cables are for light switches (Cat5e), black are co-ax for the TV/radio, purple are Cat6 network cables, white cables are for the alarm system and the grey round cables are for data/telephone. There are a lot of them!