The majority of the flagstones have been laid in the lower terrace. They still need to be pointed as well as the holes drilled for the lights and the ashlar steps installed. Things are being held up a little bit by the weather as well as the availability of the stone steps (the local quarry is very busy!).
The flagstones gently slop away from the house and any rainwater is connected by a drain that runs along the back of this area (you can just see the slot (protected by a yellow strip) to camera right). There are a couple of flagstones that are propped up against the wall. These need to be drilled to take the uplighters that will be installed later.
The flagstones have now been laid in the lower terrace in the sunken garden. The holes for the uplighters will be drilled next week and we should then be able to get all the flags laid in this area. We are going to use a special epoxy compound for the pointing, but this will be done when all of the flags have been laid.