Yesterday it rained, so we made the best of it and took the opportunity to pick up more of the remaining bits of ashlar from the quarry.  Some of these peices are seriously big and will need a crane to be able to lift in them into position.

These are amongst the largest pieces of ashlar that are going into the extension.  Some of the larger peices are over 3/4 tonne and will require a crane to lift into position.

These are amongst the largest pieces of ashlar that are going into the extension. Some of the larger peices are over 3/4 tonne and will require a crane to lift into position.

This is the last batch of ashlar and some of these pieces are seriously big.  Far too big to manhandle.  We will need to use a crane to lift some of these.

This is the last batch of ashlar and some of these pieces are seriously big. Far too big to manhandle. We will need to use a crane to lift some of these.