At last all of the ashlar is in place and all of the flagstones are down. There is still pointing to do, but that is going to have to wait a bit until the weather improves – it can’t be too wet or too cold when doing the pointing.

Three sets of steps and 160 square meters of flagstones. The pointing is still to be done between the flagstones, but we are going to have to wait for some better weather. The lights are still to be installed (although the holes and wiring have been put in place).

We still have to point the flagstones. This will be done using lime pointing (just like the main house), however, this is going to have to wait for better weather.