Both pairs of rear doors have now been installed.  They are big and let a lot of light into the building.  It is good to have the temporary boarding removed.  It gives a much better impression of what these rooms will be like when finished.

They are 2 locks on each door, so a total of 8 across all of the doors.  The joinery arranged for the locks to be “suited” so the same key is used on all 8 locks. It just makes life a lot easier!

The second pair of rear doors were installed yesterday.  The doors on the left are into the snug and the doors on the right are into the hall.

The second pair of rear doors were installed yesterday. The doors on the left are into the snug and the doors on the right are into the hall.

This is the view from inside the hall.  There is now a lot light inside the hall.

This is the view from inside the hall. There is now a lot light inside the hall.

The steel post between the two doors will be covered in plasterboard and then plastered.

The steel post between the two doors will be covered in plasterboard and then plastered.