Now the carpets are down, it is time to start on the timber flooring. There will be timber flooring in the lounge, hall and study. Since the lounge is on the same heating zone as the kitchen, the underfloor heating has been turned off for the last week or so.
We are using engineered Oak boards. Solid oak boards were shrink and twist with the heat from the underfloor heating. The oak flooring should match the oak in the exposed oak trusses. Once the floor is down, it is sealed using a
The flooring is being installed by CJ Flooring in Huddersfield.
The timber flooring has to be made from engineered boards rather than solid boards. This is due to the underfloor heating. The boards are glued onto the concrete screed. This helps with the heat transmission through the floor.
We have started putting the timber flooring down in the lounge. The underfloor heating in here has been off for the last week or so since it is on the same zone as the kitchen where we have been tiling the floor.
The timber flooring is glued to the cement screed. This helps transmit the heat from the underfloor heating. The glue goes off in about 4 hours, but in practice you can walk on it straight away as long as the boards are tightly fitting.