The front wall and the flagstones were finished on Saturday morning.  All of the materials used (except the sand and cement) had been salvaged from elsewhere on site.  Most of the flagstones were from the kitchen in number 10.  It is good to see them being reused and not one bit out of place.

We have already laid the conduit and a set of cables for the lights that will light up the front of the house at night.  We should get around to this later this week, depending on the weather.

There are two steps up to a set of flagstones.  All of the flagstones were had salvaged when renovating the property.

There are two steps up to a set of flagstones. All of the flagstones were had salvaged when renovating the property.

We had to remove the shoe off the bottom of the drain pipe to accommodate the new flagstones.  We will cut the drainpipe and refit the shoe now that the flagstones are in place.

We had to remove the shoe off the bottom of the drain pipe to accommodate the new flagstones. We will cut the drainpipe and refit the shoe now that the flagstones are in place.

This old stone drain (and cast iron grate) was still in use when we bought the property.  It was however elsewhere and we have relocated into the new flagstones in the front of the property.

This old stone drain (and cast iron grate) was still in use when we bought the property. It was however elsewhere and we have relocated into the new flagstones in the front of the property.