Despite the installation of the kitchen being delayed by two weeks, the tiles arrived today.  These are due to be fitted next week once the kitchen was fitted (or not).  We will go ahead and complete the tiling anyway before the kitchen worksurfaces are installed.

These have been stacked in the porch out of the way.  They will be laid next week.

These have been stacked in the porch out of the way. They will be laid next week.

It took about a week between ordering these tiles and them being delivered.

It took about a week between ordering these tiles and them being delivered.

This is one of the kitchen tiles laid next to the new units.  These tiles are 60x60 cms and are shipped 4 in a box.

This is one of the kitchen tiles laid next to the new units. These tiles are 60×60 cms and are shipped 4 in a box.