And the house looks very different.  The rebuilt extension is going to be sandblasted tomorrow (Saturday) afternoon.  We are doing the sandblasting at the weekend since it isn’t really possible for anyone to work on site while the sandblaster is working.

The new windows are being installed on Monday, so there is quite a bit of work to be done this weekend in preparation.

The scaffolding was removed today to reveal the front of the property.  There will be a new porch built to the left, hence, this part of the building has not been sandblasted.

The scaffolding was removed today to reveal the front of the property. There will be a new porch built to the left, hence, this part of the building has not been sandblasted.

With the scaffolding gone, you can see the rear of the property.  The large set of 4 windows on the ground floor are going to be replaced as the new ashlar has a fault in it. Ho hum.

With the scaffolding gone, you can see the rear of the property. The large set of 4 windows on the ground floor are going to be replaced as the new ashlar has a fault in it. Ho hum.

The work on the roof of the rebuilt extension has ground to a halt as the wrong Velux windows were dispatched.  The correct ones should be with us on Monday when the roofing work can recommence.

The work on the roof of the rebuilt extension has ground to a halt as the wrong Velux windows were dispatched. The correct ones should be with us on Monday when the roofing work can recommence.