We are going to be moving both the water and electric connections around to the new utility room.  This was something that got missed off the original budget and can be a significant cost.

We have decided to dig the trench now.  Once the new extension is built, the access would be severely limited by this trench.  So we are going to do it now, lay the pipework and fill it back in before the porch is built. 

We are also going to put connections into the outbuildings for both water (for the orchard and polytunnel) and electric for the sheds (lighting and power).

This was completed in a day.  Probably another day's work will get it to the utility (!) room.  We will put a connection into the outbuildings for both water and electric.

This was completed in a day. Probably another day’s work will get it to the utility (!) room. We will put a connection into the outbuildings for both water and electric.

The new water and electric connections will go in this trench.  It is cheaper for us to dig it and put in the conduits rather than the utility companies doing it. The tarmac is cut with a floor saw and then a mini digger is used for the trench.

The new water and electric connections will go in this trench. It is cheaper for us to dig it and put in the conduits rather than the utility companies doing it. The tarmac is cut with a floor saw and then a mini digger is used for the trench.