We made a start today on installing the underfloor heating. We are installing this throughout the building – both upstairs and downstairs.
The upstairs heating works via a system of metal plates that are fixed to the underside of the floorboards and heated by a set of water pipes. We left a 25mm gap between the large oak beams and the floor joists to make installing the plates a little easier. We have also cut out notches in the joists before the floors went down to make it easier to run the pipework.
All in all, it only took a day to install all of the underfloor metal plates.