With the lower terrace now flagged, our attention has moved to the upper terrace. This is considerably smaller, so will not take nearly as much time to get done. Two days in and probably 60-70% of the upper terrace has been flagged.
Tomorrow the holes are going to be drilled for the lights to be installed in the garden. While these are being drilled, Paddy and Jonny are going to flag the area under the front porch. We will see considerable progress by the end of the week.