The weather this week hasn’t been great.  And the weather today has been great either.  The fog never really lifted at all.  However, we are continuing to make progress in the sunken garden and it is starting to feel like we have turned a corner.  The main thing that is holding us up now is the delivery of the stone steps from the quarry.  This was meant to take 4-5 weeks, but we are now on week 6.  I am guessing that by the middle of next week that we may run out of things to do if the stone doesn’t arrive.

The last of the has been completed so that the flagstones can be laid on the upper terrace.  This small wall can't be seen (it is under the hessian) as it is being protected from the wet weather that we have had today.  We have also had the holes drilled to take the lights in both the lower and upper terraces.

The last of the has been completed so that the flagstones can be laid on the upper terrace. This small wall can’t be seen (it is under the hessian) as it is being protected from the wet weather that we have had today. We have also had the holes drilled to take the lights in both the lower and upper terraces.

The wall that we have built today is hidden under the hessian.  There is still some work to be done on the other side of the wall, but that will have to wait until tomorrow.  Hopefully, the weather will be a little bit better!  Or rather drier!

The wall that we have built today is hidden under the hessian. There is still some work to be done on the other side of the wall, but that will have to wait until tomorrow. Hopefully, the weather will be a little bit better! Or rather drier!

A view from above showing one of the 92mm holes that have drilled in the flagstones to take the lights.  The wires were laid a few weeks ago before we put down the crushed stone.  We worked out that these lights need to be about 300mm away from the wall to create the best effect.

A view from above showing one of the 92mm holes that have drilled in the flagstones to take the lights. The wires were laid a few weeks ago before we put down the crushed stone. We worked out that these lights need to be about 300mm away from the wall to create the best effect.

There was a small area, just behind the smaller of the front gates, that needed to be flagged.  This was completed this week.

There was a small area, just behind the smaller of the front gates, that needed to be flagged. This was completed this week.

As well as sorting out the flagstones to the rear of the property we have also sorted out the flagstones under the porch canopy.  They still need to be pointed, but the pointing will be done when all of the flagstones - front and back - have been laid.

As well as sorting out the flagstones to the rear of the property we have also sorted out the flagstones under the porch canopy. They still need to be pointed, but the pointing will be done when all of the flagstones – front and back – have been laid.