After 5 weeks of waiting, the ashlar finally arrived for the stone steps in the sunken garden. We need to get the steps into position so that we can flag up against them and get the flagging finished.

We are installing the three large ashlar slabs that are laid in front of the bi-folding doors to the lounge. This makes the top step wide enough so that the doors can be opened without overhanging the top step.

There are lights to be installed in each of these three slabs (you can see the wiring where the middle slab is still to be laid. These slabs are being moved into position using a powerful suction device.