In the last week, we have completely plastered two of the rooms on the first floor. In addition, we have boarded out most of the downstairs ready to plaster.
At the weekend, we made a start on plastering my study and the adjoining cloakroom. It will take 3-4 days before the plaster is dry enough to paint. But the rooms are already transformed.
This room is a really odd shape, but it all adds to the character of the property. I am so glad that we increased the size of the windows in here as well as swapping the original steel beam for an oak one! It is going to take 3-4 days for the plaster to dry.
The door on the left is to a WC next to the study. This has been completely plastered.
This is the downstairs bedroom in the existing cottages. We will plaster around the fireplace. We have boarded around the cellar steps and created a cupboard for the lighting computer (just above the vacuum cleaner).
The downstairs bedroom has been boarded out and will be plastered next. You can see to my study beyond.