We are making good progress this week with both the roof and rebuilding the extension.

While the weather has been good, attention has been turned to rebuilding the extension.  We can’t progress with the pointing until we have had the go ahead from the architect on the choice of materials.  We have completed a test panel for approval using Nosterfield River sand and hydraulic lime, but this needs a little bit of time to dry out so we can see the true colour.

It could a couple of days to completely felt and lathe the roof.  However, today work started on relaying the slates.  Five courses are on at the rear of the house.  Slightly less at the front, due to the rooflights having to be fitted as well.  We have had to buy some additional slates to make up for the ones that were damaged or too aged to be reused.

Concrete blockwork on the inside then 100mm insulation and finally the original gritstone on the outside.  Once it is finihsed, we will get it sandblasted to match the main property.

Concrete blockwork on the inside then 100mm insulation and finally the original gritstone on the outside. Once it is finihsed, we will get it sandblasted to match the main property.

This is the view of the front of the roof with the two rooflights.  We are waiting for some lead before the slates can be fitted underneath each of the rooflights.

This is the view of the front of the roof with the two rooflights. We are waiting for some lead before the slates can be fitted underneath each of the rooflights.

We had to change the size of the rooflights so that they would sit between the purlins underneath.  These are conservation windows from a company called Fakro (did you guess?).  They are pine on the inside, but will be painted to match the ceiling colour.

We had to change the size of the rooflights so that they would sit between the purlins underneath. These are conservation windows from a company called Fakro (did you guess?). They are pine on the inside, but will be painted to match the ceiling colour.

Five courses of slates on the back of the roof and the two re-built chimneys. This is day 3 for putting the roof back on.

Five courses of slates on the back of the roof and the two re-built chimneys. This is day 3 for putting the roof back on.