There are a number of large openings in the extension and we are using steel to bridge these openings. When finished, you will not be able to see the steel as it be covered with stone work.
Despite the bad weather, the first of the steels (the one across the top of the large custom oak window) was installed. The other steelwork is now on the ground in the right location. We will get this into position next week.
All in all, this week was one of the wettest in the build so far. Let’s hope for better weather over the next 2-3 weeks as the roof goes on.