The steel work that bridges that gap above the bi-folding doors and the large oak window in the extension has finally been installed. The poor weather yesterday meant that there were a couple of attempts to get the welding done, but with no luck.
Today, the weather improved and we got the steels welded in place. These are needed so that we can install the oak roof trusses later in the week. Many thanks to the folks at Bridge Fabrications (http://www.bridgefabrications.co.uk/) for being so flexible about getting this work done.