With the tiles in the kitchen laid and grouted, it is now time to turn our attention to the boot room and utility room.  We are using the same tiles as in the kitchen and the tiles will be laid as a continous run.  John made a headstart on tiling the utility room last week and today the boot room has been tiled.  We are still waiting for the shower tray for the boot room – this will be used to wash the dog and wellies – but hopefully it should be ready to be picked up today.

We are using the same tiles as in the kitchen.  In the far room, the boot room, there will be a showe to the left for washing the dog and wellies.  The underfloor heating has been turned off in here while we are doing the tiling.

We are using the same tiles as in the kitchen. In the far room, the boot room, there will be a showe to the left for washing the dog and wellies. The underfloor heating has been turned off in here while we are doing the tiling.

There is a shower tray to go in this position for washing the dog and muddy boots.  Our guess is that we will use this entrance most of the time.  We have picked a shower tray with a cup that allows us to remove any silt that might build up. The two white pipes are the hot and cold for the shower attachment.

There is a shower tray to go in this position for washing the dog and muddy boots. Our guess is that we will use this entrance most of the time. We have picked a shower tray with a cup that allows us to remove any silt that might build up. The two white pipes are the hot and cold for the shower attachment.

We have used the same tiles in the boot room and utility room.  These still have to be grouted.

We have used the same tiles in the boot room and utility room. These still have to be grouted.